Green LED
Indicates that the hourly generation commitment was met when the corresponding hour was completed.
GUPDATA is not a conventional graph or merely a numerical value indicator. It is a specialized SCADA screen component that compares the facility's hourly generation commitment with its actual generation along the same time axis. The control is designed around the generation schedule followed by hydroelectric power plants throughout the day and their hourly generation performance.
The upper section displays the hour, actual MW/MWh generation, GUP value, and fulfillment ratio in real time. The middle section presents the hourly generation comparison as a bar chart. The lower section contains status indicators corresponding to all 24 hours.
This layout allows the operator to view not only the current hour but also the hourly performance for the entire day at a glance.
To monitor in real time on the operations screen whether the hourly generation commitment defined by GUP is being met by actual generation. This makes it possible to quickly identify the hours in which deviations from the generation schedule occur.
The control uses DataMWMeasured for actual generation data and DataGUPMeasured for the hourly GUP value. If the hourly GUP value remains unchanged throughout the day, it may be configured as fixed GUP data instead of being read separately from SCADA during every update cycle. This behavior is associated with the ConstantGUPData property.
With the ConstantGUPData = true approach, hourly GUP values can be stored as fixed values within the control as an unchanging generation schedule. This may eliminate the need to continuously read a SCADA data point for GUP values. The source code directly supports this property.
The hour currently being monitored.
The current generation value read from SCADA.
The generation commitment used for comparison during the relevant hour.
The live ratio indicating how actual generation compares with the hourly target.
The upper information section allows the operator to read the key values for the current hour without having to examine the graph area. Hour, MW/MWh generation, GUP value, and the Fulfillment Ratio are displayed together.
The 24 status indicators in the lower section of the control represent the hours of the day. As the day progresses, the result for each completed hour can be viewed through its corresponding indicator.
Indicates that the hourly generation commitment was met when the corresponding hour was completed.
Indicates that the hourly generation commitment was not met when the corresponding hour was completed.
Live generation and the fulfillment ratio for the current hour are monitored in the upper information section.
Benefit for the operator: Instead of checking the results of completed hours individually, the operator can quickly identify which hourly commitments were or were not met using the 24-hour overview.
The general properties defined in the GUPDATA source code are listed below.
| Property | EOS English Equivalent | Default | Description |
|---|---|---|---|
UCType |
Control Type | GUPDATA |
Defines the type of the user control. |
UpdateInterval |
Update Interval | 1000 ms |
Specifies the control's update cycle. |
DecimalPoint |
Decimal Places | 0 |
Specifies the number of decimal places used to display numerical values. |
UCBackColor |
Control Background Color | Transparent |
Specifies the control's background color. |
UCForeColor |
Control Foreground Color | Black |
Specifies the control's default text color. |
UCFont |
Control Font | Arial Narrow, 8.25 pt, Bold |
Specifies the control's default font. |
ConstantGUPData |
Constant GUP Data | false |
Specifies whether GUP values are used as fixed data. |
DisplayBorder |
Display Border | true |
Determines whether the control border is displayed. |
MinValue |
Minimum Value | 1 |
Specifies the lower limit of the graph scale. |
MaxValue |
Maximum Value | 5 |
Specifies the upper limit of the graph scale. |
The control's data section contains two main fields for defining the sources of actual generation and hourly GUP values.
| Property | EOS English Equivalent | Default | Purpose |
|---|---|---|---|
DataMWMeasured |
Measured MW Data | "" |
Defines the SCADA data source from which the actual generation value is read. |
DataGUPMeasured |
Measured GUP Data | "" |
Defines the SCADA data source from which the hourly GUP value is read. |
Actual generation and the hourly GUP value are evaluated together for the same hour. These two data sources form the basis of the comparison in the control's bar chart and its fulfillment status.
The official terminology in Türkiye's electricity market is Day-Ahead Market (GÖP). According to EPİAŞ, GÖP transactions are carried out daily on an hourly basis, using 24-hour periods from 00:00 on one day until 00:00 the following day. Market participants submit their offers to the market operator for the following day, and market results are determined on an hourly basis.
EPİAŞ's current offer information states that participants can submit hourly, block, and/or flexible offers for specific time periods. Hourly offers can contain different quantity and price information for different hours.
GUPDATA is not intended to model the entire market mechanism. From a facility operations perspective, it provides operators with a visual means of monitoring the generation commitment for the relevant hour by displaying it alongside actual generation from SCADA.
GÖP is EPİAŞ's official term for the Day-Ahead Market. GUPDATA is the name of the specialized user control described on this page within EOS SCADA. The value referred to as “GUP” by the control is application data representing the facility's hourly generation commitment or comparison target.
Monitoring the hydroelectric power plant's hourly generation schedule alongside actual generation.
Viewing actual generation and the target/commitment value for each hour on the same graph.
Identifying hours in which generation commitments were not met using red status indicators when each hour is completed.
Monitoring the entire 24-hour generation performance through a single control.
Using unchanged hourly GUP values as fixed data.
Monitoring generation and the fulfillment ratio for the current hour in real time.
The fundamental design principle of GUPDATA is to allow operators to monitor the day's generation schedule without switching between different screens or reports.
Note: Since market processes and rules may change over time, current EPİAŞ regulations and the facility's own generation/commitment data model should be used when operating GUPDATA.
GUPDATA is a specialized EOS SCADA user control that brings together the hourly generation commitment monitored in the context of the Day-Ahead Market, actual generation, and daily status information on a single screen for hydroelectric power plant operations.
With its combination of a 24-hour bar chart + actual generation + hourly GUP + live fulfillment ratio + green/red end-of-hour status indicators, operators can quickly and directly assess how the generation schedule is being met throughout the day.
GUPDATA = 24 Hours + Actual Generation + Hourly GUP + Fulfillment Ratio + Hourly Status